Installation and commissioning

Air Conditioner Installation in Nessebar and Burgas

Reliable operation starts with the right location and installation in line with the manufacturer's instructions. We plan the pipe route, condensate drainage and unit positions for the room and property.

What standard installation includes

Standard installation covers a residential split unit with normal access and a pipe run of up to 3 metres. We confirm site conditions and the exact scope of the quote before work begins.

  • Mounting and levelling the indoor and outdoor units.
  • Connecting the pipework and electrical connections.
  • Vacuuming, test operation and remote-control guidance.

Positioning for the room and building

Placement affects airflow, noise, service access and condensate drainage. We discuss the available positions before drilling and account for the property, whether it is a home or commercial premises.

  • Air direction and clearance around the indoor unit.
  • Safe access to the outdoor unit for installation and future maintenance.

When additional work is required

Longer pipe routes, concealed installation, reinforced-concrete drilling, work at height and specialist brackets are assessed separately. We confirm materials and costs before proceeding.

  • For pipe runs longer than the standard allowance, see extended pipe installation.
  • A site visit may be needed when the installation is not pre-prepared.

Installation and commissioning

Frequently asked questions

How long does a standard installation take?

Timing depends on access and building conditions. We confirm the expected schedule after checking the unit and the property.

Are pipework and brackets included in the price?

The scope depends on the selected installation package and the site. Check the current quote for included pipe length, materials and any additional charges.

Hero Image

PLAN THE AIR CONDITIONING RIGHT FROM THE START.

A better project. A cleaner installation. Fewer unforeseen costs during construction.

Contact us