Planning the pipe route
Pipe length and height difference must stay within the limits set by the manufacturer. We assess the route, fixing points and condensate drainage before starting work.
- Measure the required length and difference in height.
- Choose between surface trunking and a prepared concealed route.
Materials and installation
The route uses insulated copper pipes and suitable connection materials. Longer runs may require additional refrigerant in accordance with the unit's technical data.
- Maintain continuous insulation and correct pipe-bend radii.
- Check connections, vacuum the circuit and test the system after installation.
Pricing and site assessment
The final price depends on unit capacity, pipe length, wall material, access and additional work. We confirm the scope and any extras before work begins; complex layouts may require a site visit.
- Share the address, unit model and approximate route length.
- Mention concrete, façade insulation or work at height in advance.


