How relocation works
First we confirm that the new position is suitable and whether the existing pipe route can be reused. After removal, we plan transport, brackets and connections at the new address.
- Assess access and the proposed position of both units.
- Remove, transport and refit the unit to the agreed scope.
Checks before reinstallation
If existing pipework is to be reused, its condition and compatibility with the unit are checked. Seals, insulation, brackets or pipework may need replacement.
- Check connections and condensate drainage.
- Vacuum, test-run and check operating modes after installation.
Pricing depends on sites and access
The quote depends on capacity, distance between addresses, height, removal conditions and any new materials. We confirm whether the scope is removal only or full reinstallation.
- Share photos of the old and new positions if available.
- Mention lift access, façade access and your preferred date.